Get Looped Promotion

The first 100 DSL lines installed get Free standard installation and equipment.
The terms of this offer include.
The order must be placed within the first 60 days of our DSL network going online.
The order must be one of the first 100.
Regardless of the start date the promotion ends September 30, 2000.
The circuit must be within the area that Elite.Net serves and must meet circuit qualification requirements such as distance and availablilty of copper circuits.
Added cost beyond the standard install are not included.
Equipment may include :
Efficient 5851 (flowPoint 220 Router) for SDSL
Efficient 58xx (FlowPoint 2200 Bridge) for SDSL and ADSL
Efficient 5871 (FlowPoint 144 Router) for IDSL
EARLY TERMINATION FEE is $500 for each circuit obtained under this program.

Efficient.com  
Related Links
DSL and wireless


Posted: April 25, 2000